Feasibility studies, ESIA, Detailed Preliminary Design and CAD, of the Tirso – Flumendosa – Campidano and Sulcis Inglesiente integrated hydraulic and energy system.The project provides an integrated hydraulic and energy system for the development of solar energy and water resources.…
The project area is a mountainous region in northern Italy with high landscape and environmental value The project concerns the realization of a small hydropower plant located at 1365 m a.s.l., along the river Orsolina. The water is conveyed through…
The objective of the Consultancy service is the design of a wind park aimed at the production of energy from renewable sources. The realization of the wind farm, located in the municipalities of Viticuso and Vallerotonda (FR – Italy), is…
The works concerned the construction of civil works, mechanical systems, electrical and special systems for the construction of new buildings intended forNew accesses; New operating unit – New resuscitation unit – New first aid unit; New technological center for the…
The connection road extends for approximately 5.200 meters in total, out of which 793 m form the viaduct and the rest 4.407 m extend below, above and on the ground level. On some points restraint works have been carried out…